Using underlayment under your bamboo floor can provide soundproofing, moisture protection, and stability and reduce wood on wood squeaking.
You must float you bamboo flooring over an underlay. If you have tongue and groove bamboo flooring then you will need to glue along the tongue and groove joints to fix the planks together, but you should not glue the flooring to the underlay, it should be laid loosely on top.
For the homeowner willing to break a sweat, DIY installation is possible for all Ambient bamboo flooring. But be aware that installing non-click-lock tongue-and-groove bamboo flooring is difficult and can be messy. Can Bamboo Flooring be installed over tiles? It is possible using the floating floor method.
However, it is also recommended using the direct stick method and the installation depends on the original tiles condition. The removal of the tiles is an extra cost. The Powernail is one of the few nailers able to do so. This is because the base adjusts above and below the floor board to get a tight fit inside the nail pocket. If you can see the tongue of one of the boards, you should be able to fill it with latex floor filler.
If the gap is wide enough for you to see the subfloor, however, two-part epoxy wood filler is a better option. Latex filler will sink into the gap and will probably crack.
The proper way to install laminate flooring is to use the tongue and groove locking system to click planks together, creating a smooth and seamless floating surface. While bamboo is a relatively hard material, it can be subject to scratches, dents, and cracks under certain conditions. Over time, pet nails, unpadded high heels, and dragging furniture across the floor can cause unsightly marks.
Some common tools that are needed regardless of the type Wood or Wood look flooring installation are as follows: Proper Safety Equipment. You then start at the furthest end of the room for horizontal flooring and start laying down the bamboo planks. Fit the planks together so the tongues and grooves firmly interlock. Use a rubber mallet to knock the pieces tightly together. The same process is used for vertical flooring only you will start at a wall that is either to the left or right of the door.
More than likely the planks will be shorter than the length or width of the room. This means you will have to measure the gap between the end of plank and the wall. Then cut a piece of bamboo plank to size and use a pry bar to fit the piece into place. If the piece remaining is longer than 8 inches then use it to start the next row of bamboo planks.
This creates a better look to the flooring and reduces wastage. As a consequence of this you need to use spacers to allow for the expansion of the planks. Lay spacers against your starting wall and at each end of of a row of planks. Quick lock bamboo flooring comes in rectangular pieces with a thin piece of underlay glued on. This is the very easiest way to install bamboo flooring. Quick lock bamboo flooring looks, in my opinion, very flimsy.
Have a look at the video:. With this method it is very important to first ascertain if the concrete sub-floor is damp in any way.
If the concrete is in any way damp then the bamboo will warp over time. One method to check the concrete for dampness is to simply feel the concrete with your hand, a more precise method, however, is to buy a dampness test kit. For this reason it is advisable to never glue strand woven bamboo flooring directly onto a concrete sub floor in a basement.
Once the mastic has been given time to dry then you install the strand woven bamboo flooring in a similar way to with a floating installation. You place spacers against your starting wall. Be sure to have the groove against the wall and the tongue facing away from the wall.
With this type of installation you put glue on the tongue to hold the bamboo flooring together AND you put glue on the underside of each plank to attach it to the floor. If the floor is slightly rough as opposed to smooth then the glue will form a stronger bond between the strand woven bamboo and the floor.
Use a pry bar to get the cut piece in place. Use the left over piece of the cut bamboo plank to start the new row of flooring if it is longer than 8 inches. This creates a more interesting pattern to the flooring and cuts down on wastage,.
Allow the glue to dry before using the room and putting out furniture. Drying usually takes 72 hours. If you do not have the tools necessary to complete the installation, you can easily rent them at any home improvement store. The first step to installing your bamboo floor is to make sure you have all the materials and tools necessary.
That way, you will be completely prepared to begin your installation. One of the most important steps when installing a natural bamboo floor is to properly prepare the subfloor. Your subfloor should be:. Define what type of project you have.
There are three types of bamboo installation:. Gather all your materials and tools. It is also important to order extra bamboo planks in case you make an error cutting or you need to replace a plank down the road. Lay your floor without adhering it to the subfloor.